Gross Area
62,000 Sq. Ft.
Role Scope
Full Turnkey Prefabricated Framing Package
Location
Broomall, PA
Solution Type
Pre-Fab Framing
Project Type
Mixed-Use / Commercial
Delivered
2022
Completed two weeks ahead of schedule despite beginning with prototype steel framing drawings that required full conversion to wood before fieldwork could begin.
Adaptability to late-stage design changes, without losing schedule, requires deep preconstruction planning capability and a framing team that can work from imperfect starting documents.
Converting steel to wood midstream without missing a beat
The Fairfield Inn & Suites in Broomall, PA is a four-story hotel project that required major design adaptation when the structure shifted from steel to wood framing during development. Quality Buildings to delivered a turnkey framing package and convert prototype light-gauge steel plans into a fully buildable wood-framed solution. Through QB’s detailed preconstruction process, the team identified and corrected critical layout issues, coordinated plumbing and shaft wall locations, and engineered floor systems to avoid conflicts in 94 of 110 guest rooms. Despite the midstream changes, QB completed the project two weeks ahead of schedule, helping bring much-needed lodging capacity to Delaware County.


Ray McDowell
Project Manager, Lynmar Building & Maintenance Contractors
"Quality Buildings consistently provided the required number of qualified personnel and was able to adapt and follow our construction schedule. Quality Buildings' foreman was consistently looking ahead, asked the right questions, and alerted the Lynmar job supervisor of potential problems and solutions."
Project Gallery
2022






Up Next
Bethel Village Affordable Housing




