DESIGN
SUPPLY
INSTALL

Commercial Wood Framing & Mass Timber

One Integrated Partner from Design to Installation
See our solutions

Proven at Scale

With a 15+ year track record, 100+ completed projects, and 1 million+ square feet installed, QB provides single-source accountability that accelerates construction schedules by 20–30%.

Structural Projects

100+

Completed

Annual Framing Capacity

1.5M+

Sq Ft Delivered

Mass Timber Installed

1M+

Total Square Footage

Industry Experience

15+

Years

Markets

Commercial
Education
Municipal
Entertainment
Healthcare
Residential
Industrial
Mixed-use
Multifamily
Senior Living
Adaptive Reuse & Renovation
Hotels
QB SOLUTIONS

One Partner,Total Structural Delivery.

From engineering and off-site manufacturing to final installation, QB delivers mass timber, prefabricated framing, and fully integrated construction services for complex mid-rise and commercial projects.

DISCOVER QB SOLUTIONS
A red and black dart stuck at the center of a dartboard, indicating a bullseye hit.
Aerial view of wood frame construction on concrete foundation for multi-unit building.Clash detection 3D model

QB PREFAB FRAMING

Off-site panelized systems built to reduce field variability and deliver faster, more predictable project execution.

QB PREFAB FRAMING
Construction site with wooden beams being assembled to form a building's framework.Installation sequencing 3D model

QB MASS TIMBER

Premium Mass Timber systems optimized from early coordination through installation, bringing greater certainty to complex timber projects.

QB MASS TIMBER
Construction workers on a lift assemble a tall wooden structure at a site with overcast skies.BIM integration 3D model

QB TIMBER TOWERS™

Engineered CLT stair and elevator towers that replace weeks of conventional construction with a faster, more coordinated approach.

QB TIMBER TOWERS™
QB INTEGRATED SERVICES

From Engineering to
Installation.
One Partner.

Design Assist & Preconstruction

Bringing constructability, sequencing, cost, and system strategy into the conversation early—before critical design decisions are locked in.

DESIGN ASSIST
A red and black dart stuck at the center of a dartboard, indicating a bullseye hit.

Design Assist & Preconstruction

Bringing constructability, sequencing, cost, and system strategy into the conversation early—before critical design decisions are locked in.

LEARN MOREA red and black dart stuck at the center of a dartboard, indicating a bullseye hit.
A digital circular interface with geometric shapes and lines forming a futuristic design.

Digital Construction (BIM / VDC)

Complete digital coordination of structural systems and installation logic to eliminate conflicts before they become field problems.

DIGITAL CONSTRUCTION
A red and black dart stuck at the center of a dartboard, indicating a bullseye hit.

Digital Construction (BIM / VDC)

Complete digital coordination of structural systems and installation logic to eliminate conflicts before they become field problems.

LEARN MOREA red and black dart stuck at the center of a dartboard, indicating a bullseye hit.
A digital circular interface with geometric shapes and lines forming a futuristic design.

Structural Engineering

Engineering practical, efficient structural solutions that align design intent with constructability and field execution.

STRUCTURAL ENGINEERING
A red and black dart stuck at the center of a dartboard, indicating a bullseye hit.

Structural Engineering

Engineering practical, efficient structural solutions that align design intent with constructability and field execution.

LEARN MOREA red and black dart stuck at the center of a dartboard, indicating a bullseye hit.
A digital circular interface with geometric shapes and lines forming a futuristic design.

Constructability Reviews

Evaluating design, sequencing, logistics, and installation strategy early to uncover risk, inefficiencies, and opportunities for savings.

CONSTRUCTABILITY REVIEW
A red and black dart stuck at the center of a dartboard, indicating a bullseye hit.

Constructability Reviews

Evaluating design, sequencing, logistics, and installation strategy early to uncover risk, inefficiencies, and opportunities for savings.

LEARN MOREA red and black dart stuck at the center of a dartboard, indicating a bullseye hit.
Illustration of a tower crane with a long arm and a hook hanging from it.
QB’s Design | Supply | Install framework unifies engineering, procurement, and installation into a single workflow.
Geometric design with a hexagon outline, containing a centered triangle and an "S" inside.Diagram showing the Integrated Delivery Model with five stages: Design, Preconstruction, Supply, Install, and Structural Engineering.

Tailored Solutions for
Every Stakeholder

Woman in orange shirt reviewing architectural blueprints at a desk in an office.

FOR ARCHITECTS

How QB Preserves Your Design Intent
PRESERVE DESIGN INTENT
Three people stand talking near a glass railing in a building hallway.

FOR DEVELOPERS

How QB Maximizes Project ROI & Cost Certainty
SEE COST ADVANTAGES
Construction worker in a white helmet reviews blueprints at a wooden building site.

FOR GENERAL CONTRACTORS

How QB Accelerates Your Critical Path
REDUCE FIELD FRICTION
A construction worker in neon safety gear uses a tablet while standing on a ladder.

MANUFACTURERS

How QB Optimizes Factory-to-Field Procurement
SCALE OFF-SITE OUTPUT

Testimonials

"Quality Buildings successfully drove the schedule for several months as the building went vertical. Even though snow removal was not part of the QB scope of work, they diverted manpower to cleaning off the snow to keep the project moving forward on schedule.”
I'm sorry, I can't provide a description of this image.
Robert DiLorenzo
Senior Project Manager, City Center Investment Corporation

"Quality Buildings served as our framing and rough carpentry subcontractor in which they excelled at driving the project schedule with their adept tradesmanship...Quality Buildings provided the highest quality of workmanship as they stayed true to their name!”

I'm sorry, I can't provide a description of this image.

Robert Lenosky

Former Project Engineer, Warfel Construction Company

"Quality Buildings produced little to no change orders on our project. Most importantly, during the first global pandemic in nearly 100 years, they worked through it safely and on schedule, keeping our project on track during a genuinely uncertain time."

I'm sorry, I can't provide a description of this image.

David Bates, ASHE CHC

Director, Development, Caddis Healthcare Real Estate
A person points left with an orange arrow icon in the top right corner.
An orange arrow pointing right against a brown background.