Full Turnkey Prefabricated Framing Package

Pleasant View Community

ALL PROJECTS
Gross Area
100,000 Sq. Ft.
Role Scope
Full Turnkey Prefabricated Framing Package
Location
Manheim, PA
Solution Type
Pre-Fab Framing
Project Type
Senior Living
Delivered
2019
Use of the Magni Lift reduced the panel-setting crew from five workers to three while simultaneously reducing injury exposure.
Equipment selection in prefab framing is a force multiplier. Deploying the right specialized lift not only improves safety but directly reduces labor requirements and maintains schedule velocity on multi-building simultaneous construction.
One machine doing the work of three

The West Lawn development at Pleasant View Senior Living Community consists of two 3-story buildings, each with 18 hybrid apartments, and a rooftop deck. With both buildings under simultaneous construction and limited site space, Quality Buildings deployed a Magni Lift—a single piece of equipment that functions as three—to set wall panels and roof trusses efficiently. The Magni Lift was specifically chosen for its ability to handle the height and weight of the wall panels while reducing both back strain injury risk and crew requirements. With the Magni Lift, the number of workers needed to set walls was reduced from five to three—with one of those being the remote-controlled lift operator. Structural shearwall rods required precise alignment into concrete walls, which Quality Buildings managed by annotating exact rod locations on their wall panel shop drawings, avoiding guesswork and keeping the project moving.